Arrival and setup
Bob attaches his leg extensions
Clamped together. Now for the connecting tracks
Up and Running. Again we've gone with the "U" shape which works pretty well and it gives us room inside to sit.
A look at the whole layout from the opposite side.
An Alco waits for a Hudsen 4-6-4
Steve's Rio Grande Challenger
First run on Saturday
Josh's first try at the controls
Daylight takes a break
Russ's new Rio Grande steamer and coaches
Steve's steel mill
Josh at the throttle
UP pulls some container cars
Previous
Next