Arrival and Setup
Getting everything lined up and wired up
Making the final adjustments
Adding the connecting tracks
Jasons three brand new five footers. This will become a scene from Weber canyon
Getting some electrical and track problems fixed. Always a problem with new modules
Bob makes the first run of the day
Daves conveted his two GP7's to DCC and tried them out for the first time.
Entertaining the crowds
Four trains at the same time all running DCC.
Nate runs a UP consist while Karen does an operating session
Main show floor
Previous
Next